Quote:
Originally Posted by user_mwag
We have several PMs (Project Managers) using one resource pool, and multiple resources working across different PMs projects. If one PM updates a resource's calendar (with a vacation or schedule change) this can throw off the other PMs project plans. Is there anyway for Project to auto notify when a change like this occurs so that plans won't be disrupted or changed unnoticed?
|
Dear Sir
I have installed TFS server 2005 at one machine and I have MS Project Server 2007 another machine. Now I want to connect Project server with TFS. I got the one link (
http://www.codeplex.com/pstfsconnector/Wiki/View.aspx?title=Setup%20Guide), here I got the VSTS connector for MS Project Server 2007 and TFS 2005 integration. TFS2005 software is working very well before this connectore installation. When I installed the connector by following the proper guideline which are present at given link. After complete installation, When I start the TFS Server and open the TFS Explorer then I got following error.
"TFS31001: Team Foundation cannot retrieve the list of team projects from Team Foundation Server ss01-cpu-118. The TEam Foundation Server returned the following error: The request failed with HTTP status 404:."
I was installing this connector on TFS Machine as per guideline which are given on website(
http://www.codeplex.com/pstfsconnector/Wiki/View.aspx?title=Setup%20Guide). I was login with TFSSETUP on TFS machine. Although I have installed TFS server 2005 with this Login. While on installation I used the TFSSERVICE account for TFS installation.
Please if any one have any solution about this problem. Please let me know ASAP.
Thanks
Best Regards
Muhammad Waseem Alvi